The Government of Pakistan has introduced the Prime Minister Electric Bike Scheme 2025 under the national PAVE program (Pakistan Accelerated Vehicle Electrification). This initiative is a major part of the New Energy Vehicle (NEV) Policy 2025–30 and is designed to provide eco-friendly, low-cost transport solutions to students, workers, and citizens across the country.
By offering direct subsidies and installment options, the scheme aims to make electric bikes affordable for those who cannot manage rising petrol expenses.
Overview of the Scheme
- Officially launched in August 2025 from the Prime Minister’s Office.
- Managed by the Engineering Development Board (EDB), Ministry of Industries & Production.
- Covers electric bikes, rickshaws, and small EVs.
- Target audience: students, job seekers, and low-income citizens.
- Application available nationwide via the official portal.
Key Dates
Stage | Date |
---|---|
Launch of Policy & Scheme | August 2025 |
Online Applications Open | Currently Active |
Last Date for Phase-1 | September 30, 2025 |
First Batch Delivery | Expected by end of 2025 / start of 2026 |
💡 This is only the first phase. More batches will be opened in the coming months.
Who Can Apply?
To qualify, applicants must meet the following:
- Must be a Pakistani national with valid CNIC.
- Minimum age: 18 years.
- Driving license or learner’s permit (for two-wheelers).
- Priority given to students and job seekers.
Documents Required:
- CNIC (front & back)
- Passport-size photo
- Driving license / learner’s permit
- Proof of residence (utility bill)
- Active phone & email address
Subsidy & Installment Plan
The government has allocated fixed subsidies to reduce the cost of electric vehicles.
Vehicle | Subsidy Amount | Final Price Range (after subsidy) | Payment Tenure |
---|---|---|---|
Electric Bike/Scooter | Rs. 65,000 | ~Rs. 160,000–180,000 | 24–36 months |
E-Rickshaw | Rs. 400,000 | ~Rs. 350,000–400,000 | 36 months |
Small Electric Car | Rs. 150,000 | Model-dependent | 36–48 months |
👉 Example: An e-bike priced at Rs. 235,000 becomes Rs. 170,000 after subsidy. Banks/partners will then provide installment options for repayment.
Application Process
Here’s a step-by-step guide to applying:
- Visit the official website 👉 pave.gov.pk
- Click Register / Sign Up and create an account using CNIC and mobile number.
- Confirm OTP to verify your account.
- Log in and select your desired category (bike, rickshaw, car).
- Upload the required documents.
- Pick a partner company or model from the approved list.
- Submit the form and proceed with the financing/bank step.
- Track progress through the portal dashboard.
- If shortlisted, you will receive an SMS and email notification.
Apply Here
👉 Apply Online – PM Electric Bike Scheme 2025
⚠️ Only use the official government portal. Avoid agents and fake sites.
Why This Scheme Matters
The PM Electric Bike Scheme 2025 is not just about cheaper transport. It is about:
- Helping youth and job seekers with mobility.
- Cutting down fuel costs for ordinary citizens.
- Supporting a cleaner environment by reducing emissions.
- Creating a shift towards electric vehicles in Pakistan.
Conclusion
The launch of the Prime Minister’s Electric Bike Scheme 2025 marks a turning point for sustainable transport in Pakistan. With subsidies, easy installments, and a transparent online application process, this scheme gives students and low-income groups a real chance to own modern electric transport.
If you meet the criteria, apply before September 30, 2025 to secure your chance in Phase-1.
🚀 Be part of Pakistan’s green energy future — Apply today!